PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing duct work at the 1st floor Facing North.jpg Duct work at the 2nd floor Facing North.jpg Installed Storm piping at the 2nd floor going into the 3rd floor Facing East.jpg Installing duct work at the 2nd floor Facing East.jpg Sprinkler branches at the 1st floor Facing North.jpg Sprinkler branches at the 1st floor Facing South-East.jpg Started installing the sprinkler branches at the 1st floor Facing West.jpg
Previous pageNext page Installed Storm piping at the 2nd floor going into the 3rd floor Facing East
Installed Storm piping at the 2nd floor going into the 3rd floor Facing East